BP ZhuHai Petrochemical Water Treatment Skid
- Client:BP ZhuHai Branch
- Treatment Capacity:2*100t/d
- Project Location: ZhuHai China
- Process adopt:MMF+ACF+CB+AB+MB
- Delivered time: May 2026
This project,which is implemented by Rockerhill, serves BP's Zhuhai petrochemical base, primarily meeting the demand for high-quality industrial pure water during production (boiler feedwater). The system is designed with a dual-parallel layout (2×100t/d), providing a total daily water production of 200 tons, ensuring continuous water supply from one unit while the other is undergoing maintenance.
This process combination (multi-media + activated carbon + ion exchange) is a classic pure water preparation solution in the chemical industry, exhibiting strong resistance to shock loads and stable effluent quality.




