BP ZhuHai Petrochemical Water Treatment Skid

  • Client:BP ZhuHai Branch
  • Treatment Capacity:2*100t/d
  • Project Location: ZhuHai China
  • Process adopt:MMF+ACF+CB+AB+MB
  • Delivered time: May 2026

 

This project,which is implemented by Rockerhill, serves BP's Zhuhai petrochemical base, primarily meeting the demand for high-quality industrial pure water during production (boiler feedwater). The system is designed with a dual-parallel layout (2×100t/d), providing a total daily water production of 200 tons, ensuring continuous water supply from one unit while the other is undergoing maintenance.

 

This process combination (multi-media + activated carbon + ion exchange) is a classic pure water preparation solution in the chemical industry, exhibiting strong resistance to shock loads and stable effluent quality.

2026071913190690296
2026071913190890396