WWTP Package Design And Supply To GNGC

 

  • End User: Ghana National Gas Company (GNGC)
  • EPC Contractor: Sinopec International Petroleum Service Corporation
  • Country: Ghana
  • Delivery time: Jan 2013
  • Treatment Capacity: 1000m³/day
  • Process: MMF+filtration+Heavy metal removal+pH adjustment
  • Project Brief: Ghana National Gas Company (GNGC) is engaged in the development of gas infrastructure in Ghana. The mainly function is to provide energy for the thermo power station,in order to ensure sufficient electricity to the around city. It is an EPCC project, including 180 kilometers High pressure gas transmission pipeline,gas processing plant civil project(20thousand cubic meter concrete),500 tons steel structure prefabrication and installation,4 spherical tanks which is 2000 cubic meters installation and welding,2 water tanks which is 4000cubic meters installation and welding,2 storage tanks which is 500 cubic meters installation and welding,6000 square meter complex office building,electric meter and facilities installation. The project cost is more than 1 billion USD.
  • Wastewater generated in processes of gas purification, desulfurization, and dehydration contains pollutants such as suspended matter (such as silt, tar particles), organic matter, ammonia nitrogen, and heavy metals.
  • Our scope of work: design and fabrication of WWTP skid to this project.

 