Screening for water treatment refers to the use of automated, belt-driven filtration systems designed to remove fine to medium-sized debris from water streams in treatment plants. This process employs a rotating mesh belt to capture solids (e.g., sediment, organic matter, small plastics) while allowing water to pass through, with integrated cleaning mechanisms to ensure continuous operation. Widely used in both drinking water and wastewater treatment, Screening protects downstream processes (e.g., filters, pumps, or biological reactors) and improves overall water quality.
Screening For Water Treatment Working Principle
Screening operates through a sequential process of capture, transport, and cleaning, tailored to the demands of water treatment:
Debris Interception
A vertical or inclined mesh belt (with aperture sizes ranging from 0.2mm to 5mm) is partially submerged in the water flow channel. As raw water passes through, solids larger than the mesh openings are trapped on the belt's surface, while filtered water proceeds to the next treatment stage (e.g., coagulation or sedimentation).
Belt Rotation
Motor-driven rollers move the belt upward, lifting captured debris out of the water. The belt's inclination (typically 60°–75°) allows excess water to drain back into the channel, ensuring only solids are transported to the cleaning zone.
Automated Cleaning
At the top of the belt's rotation, high-pressure water jets (10–20 bar) or mechanical scrapers dislodge trapped debris. Stubborn particles (e.g., algae or sticky organic matter) are often addressed with secondary brushes to prevent mesh clogging.
Debris Disposal
Removed solids fall into a collection hopper or conveyor, which transports them to a sludge handling system (e.g., dewatering presses) or for off-site disposal.

Screening For Water Treatment Key Roles in Water Treatment Processes
Pre-Filtration for Sensitive Systems
Protects membrane filters, sand filters, or ion exchange resins from clogging with fine sediment, extending their lifespan and reducing backwashing frequency.
Organic Matter Removal
Captures small organic particles (e.g., food scraps in wastewater or plant debris in raw water) that could otherwise overload biological treatment stages (e.g., activated sludge tanks).
Consistent Flow Maintenance
The self-cleaning mesh minimizes head loss across the screen, ensuring stable water flow through the treatment plant and reducing energy costs for pumps.
Compliance Support
Helps meet regulatory standards for effluent quality by reducing suspended solids levels before discharge or reuse.
Screening For Water Treatment Design Features of Systems
Mesh Belt Specifications:
o Aperture Size: 0.2–1mm for drinking water (to remove fine sediment); 1–5mm for wastewater (to capture organic fragments).
o Material: 316 stainless steel mesh (resistant to chlorine in disinfection stages), polyester (cost-effective for freshwater), or reinforced polymers (for chemical compatibility in industrial water treatment).
o Weave Pattern: Woven or welded mesh; welded designs are more durable for abrasive debris (e.g., sand-laden water).
Belt Operation Parameters:
o Speed: 0.5–3 m/min, adjustable via sensors that monitor debris load or head loss (faster speeds for high-solids water, slower speeds to save energy).
o Inclination Angle: 60°–75° to balance drainage (water runoff) and debris transport efficiency.
Cleaning Mechanisms:
o High-Pressure Water Jets: Standard for most applications, using 10–20 bar pressure to dislodge particles without damaging the mesh.
o Scrapers & Brushes: Added for fibrous debris (e.g., algae or hair) that adheres to the mesh, common in wastewater treatment.
Integration with Treatment Stages:
o Positioned upstream of primary treatment (e.g., sedimentation tanks) in wastewater plants.
o Placed after raw water intake (before coagulation) in drinking water plants to protect chemical dosing systems.
|
S/N |
Project Name |
Client |
Specs |
Date of Signing |
Project location |
Status |
|
1 |
Chaohu Tanghe River Regulation Project Weir 1# Radial Gates |
Anhui Taiping Construction Engineering Co. Ltd |
40.1 m * 2.65 m |
2015.1 |
Chaohu half soup |
Completed |
|
2 |
Radial Gates and miter gate of moat ring project |
Xuchang Housing and Urban-Rural Development Bureau |
Lift dam 10.8 m x 2 m Miter gate 9.2 m by 2.5 m |
2015.5 |
Xuchang, henan |
Completed |
|
3 |
Wuwei county south Radial Gates Project |
Key Project Management Bureau of Wuwei County |
3 fan |
2015.7 |
Anhui inaction |
Completed |
|
4 |
Radial gates for Comprehensive Treatment Project of Meihe River in Zhengzhou Airport Comprehensive Economic Pilot Zone |
Zhengzhou airport baichuan ecological management engineering co., ltd |
44.8 m * 3 m * 2 33.6 m x 3 m x 4 50.4 m * 3 m * 2 The 39.2 m x 3 m x 1 61.6 m * 2.2 m * 1 |
2015.7 |
Zhengzhou airport |
Completed |
|
5 |
Nanjing jiulong lake ecological management project hydraulic lifting dam |
Nanjing Meishui Biological Engineering Co. Ltd |
27m×1.2m (5 sets) |
2015.10 |
Jiangning District, Nanjing |
Completed |
|
6 |
Liaoning Haicheng radial gates |
Haicheng Water Conservancy Construction Engineering Co. Ltd |
30m×2m (5 fans) |
2016.3 |
Liaoning haicheng |
Completed |
|
7 |
Flood control and landscape engineering radial gates in section from jihukou bridge to mengniu bridge in daheihe river |
China Water Resources and Hydropower No.3 Engineering Bureau Co., Ltd. Hohhot Daheihe District Comprehensive Improvement Project Department |
288m×3.5m (48 fans) |
2016.5 |
Hohhot, Inner Mongolia |
Completed |
|
8 |
Yuhuan County liberation north gate reconstruction project Radial Gates |
Taizhou Water Conservancy and Hydropower Construction Co. Ltd |
10m×2.5m (2 fans) |
2016.5 |
Taizhou Yuhuan, Zhejiang Province |
Completed |
|
9 |
Sanchuan town Radial Gates Project |
People's Government of Sanchuan Town |
6m×2.5m×7 fans (4 seats) |
2016.8 |
Luoyang Luanchuan Sanchuan Town |
Completed |
|
10 |
Tangshan Radial Gates Project |
Inner Mongolia Jinmao Water Conservancy Engineering Co. Ltd |
21m×1.8m (3 fans) |
2016.10 |
Hebei tangshan |
Completed |
|
11 |
Radial Gates of shengyuan power station in yichun, jiangxi |
Shengyuan Hydropower Station, Yuanzhou District, Yichun City |
6 m * 3.5 m * 4 fan 6 m x 2.9 m x 20 fan |
2016.12 |
Jiangxi yichun |
Completed |
|
12 |
Comprehensive River Channel Treatment Project of Weifen River, Zhangjia Ge Pot Section, Xingxian County |
Xingxian Ecological Environment Comprehensive Management Investment Co. Ltd |
80m×3m×2 seats (13 fans) 90m×3m×2 seats (15 fans) |
2016.12 |
Luliang Xing County, Shanxi Province |
Under construction |
|
13 |
Lengshuizhen Yuhe Radial Gates |
People's Government of Lengshui Town, Luanchuan County |
8.6 m * 1.9 m * 1 fan |
2017.1 |
Luoyang Luanchuan Cold Water |
Completed |
|
14 |
Nanyang hetian town county core area ecological restoration project radial gates |
Shanxi Shuitou Protection Technology Co., Ltd |
138m×2.5m (23 sets) 69m×2.6m (11 sets) |
2017.2 |
Datong Tian Town, Shanxi Province |
Completed |
|
15 |
The first and second level Radial Gates in the vital section of the comprehensive water pollution control project of the upper reaches of Yi River in Luanchuan County |
Shandong Yellow River Engineering Group Co., Ltd. Luanchuanyi River Upstream Water Pollution Prevention and Control Project PPP Project Management Department |
126m×4.5m (21 sets) 120m×4.5m (20 fans) |
2016.12 |
Luoyang luanchuan |
Completed |
|
The fourth grade radial gates in the vital section of the comprehensive water pollution control project of the upper reaches of Yi River in Luanchuan County |
Luanchuanyi River Pollution Comprehensive Prevention and Control Project PPP Project Management Department of Henan Provincial Water Resources First Engineering Bureau |
138m×4.5m (23 sets) |
2017.4 |
Completed |
||
|
16 |
Flood prevention sluice of environmental control project of North waterlogging fair in Binhu New District, Hefei |
Jiangsu Tianyu Environmental Protection Group Municipal Engineering Co. Ltd |
7.4 m * 4.0 m * 10 fan |
2017.3 |
Binhu New District, Hefei |
Completed |
|
17 |
Flood control sluice of xuhe drainage pumping station project in Binhu new area |
Wuxi Tuochuang Environmental Engineering Equipment Co., Ltd |
9.0 m * 4.7 m * 6 |
2017.3 |
Binhu New District, Hefei |
Completed |
|
18 |
Wuhu County Qingyi River Regulation and County Town Flood Control and Security Project Gate Crossing |
Anhui Dingyuan Engineering Construction Co. Ltd |
4.41 m * 4.25 m * 5 |
2017.3 |
Wuhu City Pass |
Completed |
|
19 |
Xiaotaihou River System Comprehensive Management and Waterfront Green Cultural Leisure Corridor Project |
Beijing Jinhe Water Construction Group Co. Ltd |
36m×4.5m (6 fans) 12m×2.35m (2 sets) |
2017.4 |
Chaoyang District, Beijing |
Completed |
|
20 |
Xiaotaihou River System Comprehensive Management and Waterfront Green Cultural Leisure Corridor Project |
Beijing Xiangkun Water Construction Co. Ltd |
6 m * 3.5 m * 1 fan |
2017.6 |
Completed |
|
|
21 |
The historical and cultural landscape zone of the Chanhe River (Wan Guo Shang Hui Section) water surface project (phase I) radial gates |
Luoyang Zonghong Construction Engineering Co. Ltd |
66m×4m (11 fans) 6 m * 1.5 m * 2 |
2017.4 |
Luoyang Mengjin Wanguo Business Hui |
Completed |
|
22 |
Guizhou Bijie radial gates |
Guizhou hao shang cheng trade co., LTD |
9m×2.2m (1 fan) 4m×2.2m (1 fan) |
2017.5 |
Guizhou bijie |
Completed |
|
23 |
Radial gates of Yanchang County Urban District Management Project of Yanhe River Comprehensive Management Project |
Shaanxi Environmental Protection Industry Group Co., Ltd. Yan 'an Branch |
60m×3m (10 sets) 78m×3m (13 fans) 66m×2m (11 fans) |
2017.7 |
Shaanxi extension |
Completed |
|
24 |
The head dam of Songxian City Water Ecological Management PPP Project and the radial gates of Lugou River Project in Yihe River |
Tiehan Ecological Construction Co., Ltd. Songxian Branch |
144m×3m (24 sets) 24m×3m×2 seats (4 fans) |
2017.9 |
Henan province song county |
Completed |
|
25 |
Radial gates for comprehensive control project of Jialu River in Zhengzhou |
Project manager of the 3rd, 5th and 6th Bid Section of the Jialu River Comprehensive Treatment Project of SINOHYDRO 11th Engineering Bureau Co., Ltd |
120m×2.8m (24 sets) 125m×2.8m (25 sets) 125m×4.3m×2 seats (25 fans) |
2017.9 |
Henan zhengzhou |
Completed |
|
26 |
Management Department of the Fourth Bid Section of Zhengzhou Jialu River Comprehensive Treatment Project of China Water Resources and Hydropower 11th Engineering Bureau Co., Ltd |
100m×4.3m (20 fans) |
2017.9 |
Completed |
||
|
27 |
Radial gates of Nansha River Phase II Project for the Further Regulation of Small and Medium-sized Rivers in Mingguang City |
Anhui Water Resources Development Co. Ltd |
204m×2m (17 fans) |
2017.10 |
Anhui mingguang |
Completed |
|
28 |
Radial gates for water storage of Miaojun power station in Ji 'an |
Ji 'an Miaojun Hydropower Development Co., Ltd |
132m×4.9m (22 sets) |
2017.10 |
Jiangxi province |
Stop doing |
|
29 |
Xinzheng Shuangji River Shuanglongba Project radial gates |
Henan Water Construction Group Co. Ltd |
18m×1.5m (3 fans) |
2017.10 |
Xinzheng, henan |
Completed |
|
30 |
Water landscape barrage reconstruction and new construction project of Xiangjiang River trunk stream and main tributaries in Zunyi City |
Guizhou Qianguan Construction Engineering Co. Ltd |
22.5m×3m (4 sets) 21m×4m (4 sets) 39.9m×3m (7 fans) 37.8m×3m (6 sets) |
2017.11 |
Guizhou zunyi |
Completed |
|
Water landscape barrage reconstruction and new construction project of Xiangjiang River trunk stream and main tributaries in Zunyi City |
Guizhou Sanpu Construction Engineering Co. Ltd |
27m×5.0m (5 fans) 32m×4.5m (6 fans) |
2017.11 |
Completed |
||
|
Water landscape barrage reconstruction and new construction project of Xiangjiang River trunk stream and main tributaries in Zunyi City |
Zunyi Water Conservancy and Hydropower Engineering Construction Corporation |
37.8m×3m (6 sets) 30m×3m (5 sets) |
2017.11 |
Completed |
||
|
31 |
Reservoir dam in Xianghe Township, Chunshui Town, Biyang County, Stone District, Point Source Wastewater Treatment Project |
Biyang County Environmental Protection Bureau |
66m×3m (11 fans) 90m×2m (15 fans) 60m×2m (10 fans) |
2017.12 |
Biyang, Zhumadian, Henan |
Completed |
|
32 |
Radial gates of zonggan river urban section reconstruction project (first phase) in qinyang city |
Henan Water Construction Group Co. Ltd |
48.8m×1.5m (6 fans) |
2017.12 |
Henan QinYang |
Completed |
|
33 |
Hydraulic lifting dam of luo river comprehensive control project in lushi county |
Luohe River Comprehensive Treatment Project Department, Lushi County, Power China Port and Shipping Construction Co., Ltd |
240m×2.3m (32 sets) 228m×2.3m (30 sets) |
2018.1 |
Lu Shi County, Sanmenxia, Henan Province |
Completed |
|
34 |
Datong Sanggan River fixed bridge ecological water storage project radial gates |
Shanxi Provincial Water Conservancy Engineering Bureau |
450m×3m (75 fans) |
2018.1 |
Shanxi datong |
Completed |
|
35 |
Nanzhang County Manhe City Section Water Environment Control Project Radial gates |
Nanzhang County Manhe Main Stream Flood Control Project Construction Management Office |
72m×4.5m (12 sets) 53.8m×3m (9 sets) |
2018.1 |
Nanzhang, Xiangyang City, Hubei Province |
Completed |
|
36 |
Longwu River Water Ecological Integrated Management Project |
Sinohydro Sixth Engineering Bureau Co. Ltd |
There are 14 radial gatesS with a total area of 1497.95㎡ |
2018.1 |
Qinghai tongren |
Under construction |
|
37 |
Inclined support hydraulic control lifting dam for comprehensive treatment project of Xinglong to Baolinqiao reach of Yangchuan River |
Guizhou China Nuclear Water Conservancy and Hydropower Construction Co. Ltd |
20m×1.5m (2 seats) 20 m * 18.2 m * 1.5 m / 3.0 m 23 m x 3.0 m / 31 m x 3.5 m |
2018.3 |
Guizhou region Yang |
Under construction |
|
38 |
Jiaozuo City Dasha River Ecological Management Lingquan Lake Reservoir Project hydraulic landscape dam |
Jiaozuo Public Welfare Water Conservancy Project Construction Management Bureau |
204m×3.6m (34 fans) 204m×3.25m×2 seats (34 fans) |
2018.3 |
Henan jiaozuo |
Completed |
|
39 |
5# hydraulic lifting dam of Bahe River Lantian County Waterway Landscape Improvement Project |
Shaanxi Shengji Water Conservancy and Hydropower Engineering Co. Ltd |
192m×3m (12 sets) |
2018.3 |
Xi 'an kai |
Under construction |
|
40 |
Steel structure arc radial gates |
People's Government of Lengshui Town, Luanchuan County |
2m×14m (2 sets) |
2018.5 |
Luoyang luanchuan |
Completed |
|
41 |
Longhe City Dike and Water Environment Comprehensive Treatment Project in Shizhu County |
Jiangsu Yancheng Water Conservancy Construction Co. Ltd |
79m×2.5m (13 sets) 114m×2.5m (19 sets) 144m×2m (18 fans) 108m×3.5m (18 sets) |
2018.6 |
Shizhu County, Chongqing |
Completed |
|
42 |
Pingyu County Water Environment Management and Ecological Restoration Project |
No. 1 Engineering Bureau of Water Resources of Henan Province |
Qilihe 42m×2.5m (7 fans) Guo lougang 30m×3.0m (6 sets) Sand silted 24 m by 3.9 m Zhang Luzhuang 21.45 m by 1.7 m |
2018.8 2018.12 2019.4 2019.6 |
Henan PingYu |
Completed |
|
43 |
Datong Yuhenan Ring Bridge - Jingda Highway Bridge Comprehensive Improvement Project |
Project Department of the First Bidding Section of Datong Yuhenan Huanqiao - Jingda Expressway Bridge Comprehensive Improvement Project of Henan Provincial Water Resources First Engineering Bureau |
300m×3.5m (50 fans) 2 |
2018.8 |
Shanxi datong |
Completed |
|
44 |
The third batch of radial gates project of biyang county stone area non-point source wastewater treatment project |
Biyang County Environmental Protection Bureau |
66m×3m (11 fans) 90m×2m (15 fans) |
2018.10 |
Henan biyang |
Completed |
|
45 |
Fujia River ecological environment comprehensive improvement and land consolidation project of the two banks |
9 MCC Construction Co., Ltd. Hanzhong Branch |
60m×4.5m×2 seats (10 fans) 60m×3.5m×2 seats (10 fans) |
2019.3 |
Shaanxi ankang |
Under construction |
|
46 |
Water Environment Improvement Project of Qinhuai River (Basalt Section) in Xuanwu District |
Jiangsu Zhongmao Construction Engineering Co. Ltd |
10m×1.5m (2 fans) |
2018.12 |
Nanjing, jiangsu province |
Completed |
|
47 |
Jiayin County Yongan East and West River Water System Connecting Project (5 bid) |
Heilongjiang Qingda Water Conservancy Engineering Co. Ltd |
66m×3m (11 fans) |
2019.1 |
Yichun, Heilongjiang |
Completed |
|
48 |
Landscape dam # 3 of ecological comprehensive regulation project on both sides of huai river in tongbo county |
Henan Zhenghai Industrial Co., Ltd. Tongbai Branch |
90m×3.7m (15 sets) |
2019.1 |
Henan tongbai |
Completed |
|
49 |
Landscape Dam No.4, Ecological Comprehensive Improvement Project of Huai River in Tongbo County |
Henan Runwang Water Conservancy Engineering Co., Ltd. Tongbai Branch |
90m×4m (15 fans) |
2019.1 |
Henan tongbai |
Completed |
|
50 |
Zhoukou East New District Yellow River Diversion and Storage Project |
Zhoukou Dongxin District Yellow River Diversion and Storage Project Construction Project Management Department, Yellow River Construction Group Co., Ltd |
50m×4.5m (10 sets) |
2019.3 |
Henan zhoukou |
Completed |
|
51 |
Five control sluice projects of pixiong river in midu county |
Dali Sifang (Group) Co. Ltd |
18m×2m×2 seats (3 fans) 21m×2m×3 seats (3 fans) |
2019.4 |
Dali in yunnan province |
Completed |
|
52 |
LX-RR-G1 of Pingxiang City and Rural Infrastructure Comprehensive Development Project with Asian Development Bank Loan: Supply and Installation of Tankou River and Qinghua River Slope Dam, etc |
Luxi County Urban Construction Investment Development Co. Ltd |
12m×2.3m (2 sets) 12m×1.2m (2 sets) 17m×2m (3 fans) |
2019.4 |
Jiangxi pingxiang |
Completed |
|
53 |
Xiandonggou reservoir project hoisting equipment manufacturing, transportation and installation project |
Shanxi Water Conservancy Construction Engineering Bureau Co. Ltd |
2000/500 kn - 8.9 m |
2019.6 |
HeNan Province |
Completed |
|
54 |
Beijing Universal Theme Park and Resort Project |
Shanghai Maiyan Trading Co., Ltd |
15m×3.2m (2 sets) |
2019.5 |
Beijing |
Completed |
|
55 |
Gate 2# of the second section of the PPP project of Gongyi ecological water system construction project |
Gongyi City Ecological Water System Construction Project Second Bid Section Project Management Department of CCCC Shanghai Highway Bureau Co., Ltd |
45m×3.5m (9 sets) |
2019.6 |
Henan gongyi, |
Under construction |
|
56 |
Procurement and installation of movable dam equipment in Changpu Xifei Section, Wuhe Section and Zhongguanshacun Section of Tianxian River Basin Comprehensive Management Project in Yuexi County, Anqing City, Anhui Province |
Renchuang Ecological Environmental Protection Technology Co., Ltd |
22m×2m×3 seats (3 fans) 32m×1.5m (5 sets) 94m×2.3m (16 fans) |
2019.7 |
Anhui YueXi |
Under construction |
|
57 |
Pukou District Chengnan River and other river courses to eliminate poor V class water quality improvement project |
China Construction Installation Group Co. Ltd |
15m×2.5m (2 sets) |
2019.8 |
nanjing |
Completed |
|
58 |
Riverside International New Town Water Regulation Project of Zhengzhou Economic and Technological Development Zone |
The Second Engineering Bureau of Henan Water Conservancy |
85m×4.5m (17 sets) |
2019.8 |
Henan zhengzhou |
Completed |
|
59 |
Gate and hoist equipment of sluice construction project No.5 of comprehensive regulation project of Lhasa river |
Shandong Linyi Hydraulic Engineering Corporation Lasa River Comprehensive Treatment Project No. 5 Sluice Construction Project Management Department |
95m×4m (10 sets) 400m×3m (40 fans) |
2019.9 |
Tibet Lhasa |
Under construction |
|
60 |
Procurement and installation of radial gates for Jinhe lift dam project of comprehensive management of urban water environment in Gao 'an city |
Gao 'an Branch of Beijing Urban Construction Group Co. Ltd |
204m*5m (34 fans) |
2019.10 |
Jiang Xigao Ann |
Under construction |
|
61 |
Xinjiang County Fenhe City District Comprehensive Treatment Project No. 1 radial gates |
Shanxi Industrial Equipment Installation Group Co. Ltd |
150m*2.9m (20 sets) |
2019.8 |
Xinjiang, Linfen, Shanxi |
Under construction |
|
62 |
Procurement and installation of radial gates equipment for the Mohe River Water Environment Comprehensive Treatment Construction Project in Neixiang County |
China Construction Bureau No.4 Construction Co. Ltd |
156m*3.5m (26 fans) 96m*3.5m (16 sets) 102m*4.0m (17 fans) 120m*3.5m (20 fans) 108m*3.5m (18 fans) |
2019.10 |
Henan NaXiang |
Under construction |
|
63 |
Radial gates for comprehensive treatment project of Hongfosi section of Hongliugou city in Hongsibao district |
Ningxia Water Conservancy and Hydropower Engineering Bureau Co. Ltd |
36m*4.5m (6 fans) |
2019.10 |
Wuzhong, Ningxia |
Completed |
|
64 |
Procurement and installation of 4+200, 8+300 radial gates equipment for the comprehensive treatment project of Maqiao River crossing the city in Dingyuan County |
Fuyang Water Conservancy Machinery Engineering Co., Ltd. Dingyuan Branch |
35m*2.5m (5 fans) 35m*2m (5 fans) |
2019.11 |
Anhui province |
Under construction |
|
65 |
Procurement and installation of radial gates equipment for embankment reinforcement project of qili section of qianmaoling river in qianshan city |
Anqing Huachuan Hydropower Engineering Co. Ltd |
48m*2m (8 fans) |
2019.11 |
Anhui buried hill |
Completed |
|
66 |
Procurement and installation of equipment for Erlang river ecological water storage dam project in susong county |
Yuexi Chenyang Construction Co. Ltd |
60m*1.5m (10 fans) |
2019.12 |
Anhui SuSong |
Completed |
|
67 |
Procurement project of overall backplane radial gates equipment and installation of Xidi Project |
Anhui Dashu Construction Engineering Co. Ltd |
18.5 m * 2 m 21 m x 2 m |
2019.11 |
Anhui huangshan |
Completed |
|
68 |
Procurement and installation of radial gates equipment for Xi 'an Zao River Comprehensive Treatment EPC Project |
China Water Resources and Hydropower No.3 Engineering Bureau Co., Ltd. Xi 'an Chang 'an District Zuo River Comprehensive Treatment EPC Project Department |
1.5m×3.5m (Height × Length) 2m×3.5m (Height × Length) 3m×4m (Height × Length) 2m×10m (Height × Length) |
2019.11 |
Chang 'an District, Xi 'an |
Completed |
|
69 |
Datong Yuhenan Ring Bridge - Jingda Highway Bridge Water Quality Improvement Project Radial gates |
Datong Tairui Group Construction Co. Ltd |
280 m * 3.5 m * 2 |
2019.12 |
Shanxi datong |
Completed |
|
70 |
The radial gates of the first phase general contract project of the Ba River Elevation and Reconstruction Project (International Port Section) of the Second Highway Engineering Bureau Co., Ltd |
CCCC Second Highway Engineering Bureau Co., Ltd. Ba River Elevation and Reconstruction Project (International Port Section) Phase I General Contract Project Management Department |
402 m by 2.75 m |
2020.3 |
Baqiao District, Xi 'an |
Under construction |
|
71 |
Yinan Yuquan Road Reconstruction Project Radial gates |
Tianyuan Construction Group Co., Ltd. Municipal Pipeline Network Branch |
9 m * 2.5 m 2.5 m * 2 m |
2020.6 |
In linyi in shandong province |
Completed |
|
72 |
Radial gates for ecological management project of western branch of Ruoqiang River in Ruoqiang County |
Xinjiang Jinhe Hydraulic Machinery Equipment Co. Ltd |
80 m * 1.8 m * 4 64 m * 1.8 m * 1 |
2020.4 |
If xinjiang qiang |
Completed |
|
74 |
Anze County Lin River water environment safety emergency project radial gates |
Shanxi Yicheng Kexin Technology Co., Ltd |
50m*2.5m (5 fans) |
2020.5 |
Shan xi ze |
Completed |
|
75 |
Radial gates for comprehensive water environment control project of liuhe ditch and tanhe river in nehuang county |
Hebei Construction Group Tianchen Construction Engineering Co. Ltd |
30m*3.5m (5 fans) |
2020.5 |
In the henan yellow |
Completed |
|
76 |
Mexico REP. 27+016 C.REFORMA |
6m*3m (2 fans) |
2021.9 |
Mexico |
Completed |
Screening For Water Treatment Key Advantages
Fine Filtration Capability
Removes smaller particles (0.2–5mm) compared to bar screens (10+mm), critical for protecting sensitive equipment like reverse osmosis membranes.
Continuous Automation
Eliminates manual cleaning, reducing labor costs and ensuring uninterrupted operation-essential for plants processing 24/7 (e.g., urban drinking water facilities).
Reduced Clogging Risk
Self-cleaning design maintains consistent flow rates, preventing process disruptions (e.g., avoiding overflow in sedimentation tanks due to blocked screens).
Adaptability
Customizable mesh sizes and belt materials allow tailoring to specific water sources (e.g., brackish water, industrial effluent, or surface water with high organic content).
Screening For Water Treatment Applications in Scenarios
- Drinking Water Treatment: Pre-filters raw water from rivers or lakes to remove fine sediment, algae, and organic particles before disinfection, improving the efficiency of chlorine or UV treatment.
- Municipal Wastewater Treatment: Captures food scraps, hair, and small plastics in influent, preventing these materials from clogging aeration systems or biological reactors.
- Industrial Water Reclamation: Treats process water (e.g., in manufacturing or power plants) by removing debris that could damage heat exchangers or cooling towers.
- Stormwater Treatment: Filters urban runoff to remove microplastics, sediment, and organic matter before discharge into natural waterways, reducing environmental impact.
Screening For Water Treatment Implementation Considerations
Mesh Selection
Balance aperture size with water quality-smaller apertures improve filtration but require more frequent cleaning (e.g., 0.2mm mesh for drinking water vs. 3mm for stormwater).
Maintenance Scheduling
Regular inspection of mesh integrity (to detect tears) and cleaning system performance (e.g., unclogging water jet nozzles) is critical for longevity.
Energy Efficiency
Opt for variable-speed motors to adjust belt speed based on debris load, reducing energy use during low-flow periods (e.g., nighttime in residential areas).
Screening for water treatment is a cornerstone of efficient, automated filtration, bridging the gap between raw water intake and advanced treatment processes. Its ability to handle fine debris while maintaining continuous operation makes it indispensable for modern water treatment plants striving for reliability, compliance, and cost-effectiveness.