|
DN20–DN600 From cabinet branches to primary mains |
≤ 1.6 MPa Primary-side working pressure |
100% Factory inspected: 24 h pressure hold, ΔP–flow, cleanliness |
Zero drip Dry-break UQD couplings, hot-swap without draining |
One supplier for the whole coolant path
Liquid cooling moves heat from high-density racks to the outdoors through two loops. The primary side carries facility water between cooling towers or chillers and the plate heat exchangers or CDUs. The secondary side carries clean coolant from the CDU through manifolds and quick couplings to the cold plates in each server. ROCKERHILL supplies every piece of hardware on that path, prefabricated and tested in the factory, so the machine room is assembled by number with almost no on-site welding.
SYSTEM LAYOUT
|
Loop |
Coolant path |
ROCKERHILL scope |
|
Primary side |
Cooling tower / chiller → plate heat exchanger / CDU |
Carbon steel DN65–600, stainless steel DN50–300, sensors |
|
Secondary side |
CDU → manifold → UQD couplings → rack cold plates |
Prefab piping DN50–300, branches DN20–40, manifolds, UQDs, sensors, coolant |
Eight product lines, one system
|
01 Primary carbon steel piping Mains from cooling towers and chillers to heat exchangers and CDUs. DN65–DN600, seamless steel, prefabricated. |
02 Primary stainless piping 304 / 316L mains and machine-room sections where water quality matters. DN50–DN300, TIG welded, passivated. |
03 Secondary prefab piping CDU to manifold and cabinet distribution. Cut, welded, cleaned, assembled and 100% inspected in the factory. |
04 Manifolds Machined 304 / 316L valve blocks, 4–24 branches, four configurations M0–M3, branch flow preset. |
|
05 UQD quick couplings Dry-break cabinet connectors. Zero drip, keyed blind-mate, tool-free live replacement. |
06 Sensors Temperature, pressure, flow, level and water quality, delivered as complete monitoring modules. |
07 Coolant Ethylene glycol fluid for cold-plate loops and phase-change dielectric fluid for immersion cooling. |
08 Delivery & O&M Installation, flushing, pressure testing, commissioning and maintenance of the full system. |
WHY ROCKERHILL
|
Almost no hot work on site Secondary-side assemblies ship pre-assembled with manifolds and UQDs and are connected by number. Welding stays in the factory, where it can be controlled and inspected. |
Tested before it ships Every assembly gets a 24-hour pressure hold, a flow and pressure-drop check and a cleanliness check. Records travel in the box. |
Balanced from day one Manifold branch valves are preset by hydraulic calculation and each unit ships with its ΔP–flow curve, so no branch-by-branch balancing is needed on site. |
Primary piping and fittings
Carbon steel
|
Parameter |
Value |
|
Nominal diameter |
DN65 – DN600 |
|
Material |
Q235B / 20# seamless steel pipe (GB/T 8163) |
|
Connection |
Welded or flanged; sections prefabricated in the factory |
|
Working pressure |
≤ 1.6 MPa |
|
Corrosion protection |
Shot blasting, epoxy zinc-rich primer + topcoat, film thickness per design |
Stainless steel
|
Parameter |
Value |
|
Nominal diameter |
DN50 – DN300 |
|
Material |
304 / 316L (GB/T 12771); butt-weld elbows, tees, reducers |
|
Welding |
TIG, argon back-purged, full penetration with double-side bead |
|
Inner surface |
Pickled and passivated; hygienic Ra ≤ 0.8 μm optional |
|
Working pressure |
≤ 1.6 MPa |
Certified welders, NDT of welds by proportion, endoscope checks of stainless weld roots, hydrostatic and ball-pass records archived by pipe-section number. Sections ship numbered for flanged assembly on site.
Secondary prefabricated piping assemblies
|
Parameter |
Value |
|
Nominal diameter |
DN50 – DN300; cabinet branches DN20 – DN40 |
|
Material |
304 / 316L stainless steel |
|
Factory inspection |
24 h pressure hold, flow / pressure-drop curve, particle-count cleanliness (100%) |
|
Packaging |
Pipe ends capped, number labels, inspection records in each box |
|
Documents |
Inspection records, ΔP–flow curve, product certificate |
|
Design basis |
Shop drawings from detailed BIM model of the machine room |
Five factory processes
- Cutting & bending. CNC bending; wall thickness and roundness checked to drawing.
- Welding. Argon-arc stations with weld parameters recorded.
- Cleaning & purging. Internal cleanliness accepted by particle count.
- Assembly. Valves, sensor seats and labels pre-installed.
- Final inspection. Pressure hold, flow pressure drop and cleanliness on every assembly.
|
TRACEABLE STAINLESS AND CARBON STEEL PIPE STOCK |
Traceable from coil to cabinet Every pipe section, manifold and sensor carries a code linked to its raw-material batch, process parameters and inspection records. One scan retrieves the full history; an abnormal material batch can be traced to the exact shipped boxes. |
Manifold distributor
|
M0 · Basic Manual ball valves; any branch can be shut off. |
M1 · Metered Branch temperature and supply/return ΔP monitoring. |
M2 · Adjustable Motorized branch valves linked to the CDU. |
M3 · Smart Per-branch flow measurement and control ports, per project. |
|
MACHINED STAINLESS MANIFOLD VALVE BLOCKS |
UQD dry quick couplings
The cabinet connection point. The dry valve core shuts off both sides on separation, so cabinets and sensors can be serviced without draining the loop. Keyed ends make it impossible to swap supply and return. Compatible with common OCP UQD specifications.
|
Zero-drip disconnect Dry core shuts off both ways |
Blind-mate, error-proof Keyed supply / return ends |
Tool-free replacement Hot-swap without draining |
|
COLOR-CODED SUPPLY AND RETURN COUPLINGS |
Liquid cooling sensors
Five measurement types cover the full monitoring scope of a liquid-cooling loop. The pressure transmitter uses a dry, oil-free ceramic capacitive cell with a 316L wetted diaphragm, which drifts less than diffused-silicon designs under year-round immersion in glycol or deionized water.
|
CERAMIC CAPACITIVE PRESSURE TRANSMITTER |
|
|
Measurement |
Requirement (GB/T 48023-2026 §9.4) |
ROCKERHILL configuration |
Covered |
|
Temperature |
Supply / return temperature |
Complete temperature points |
✓ |
|
Pressure |
Supply / return pressure, filter ΔP |
Pressure transmitters ±0.5 %FS |
✓ |
|
Flow |
Supply / return flow, class 0.5 meter |
Complete flow points |
✓ |
|
Level |
Make-up tank and system level |
Level sensors |
✓ |
|
Water quality |
pH, conductivity, turbidity |
Conductivity / turbidity points + water-quality service |
✓ |
COOLANT
|
Cold-plate ethylene glycol fluid Formulated, filled and concentration-tested with the piping system. Top-up and replacement advice follows conductivity, pH and turbidity trends, with test records kept per project. |
Immersion phase-change fluid Dielectric fluid with adjustable boiling point of 50–55 °C and dielectric constant below 2.0, for two-phase immersion cooling. Supplied with a material compatibility test report. |
Where the system is used
|
Facility |
Typical scope |
|
AI and HPC data halls |
High-density GPU racks on cold plates: full primary and secondary piping, M2 / M3 manifolds with per-branch monitoring |
|
Colocation and cloud |
Liquid-cooled rows alongside air-cooled space; prefabricated secondary loops and UQD-connected cabinets for fast tenant fit-out |
|
Retrofit of air-cooled rooms |
Weld-free secondary assemblies installed in live rooms with minimal hot work and disruption |
|
Immersion cooling |
Phase-change dielectric fluid, piping and water-quality service for immersion tanks |
|
Edge and modular data centers |
Compact factory-built loops shipped pre-tested inside containers and prefabricated modules |
From factory to commissioned system in four steps
|
01 · DESIGN BIM shop drawings Pipe routing checked in advance against civil works and cable trays. |
02 · FABRICATE Pre-assembly & full test Piping pre-assembled with manifolds and UQDs; pressure and cleanliness tested. |
03 · SHIP Numbered delivery Sections connected on site by number; secondary side essentially weld-free. |
04 · COMMISSION Flush, test, hand over Flushing, venting, pressure hold and water quality, with records in the box. |
What we check before handover
|
Item |
Typical acceptance value |
Instrument |
|
Cleanliness |
NAS class 7 (ISO 18/16/13) after flushing; stable end-filter ΔP |
Online particle counter, membrane weighing |
|
Tightness & pressure hold |
1.0 MPa for 30 min, no visible leak; ≤ 5% drop over 24 h |
Test pump, pressure recorder, IR camera |
|
Vacuum & moisture |
−0.09 MPa held; dew point ≤ −20 °C before filling |
Vacuum pump, dew-point meter |
|
Water quality |
Conductivity ≤ 10 μS/cm, pH 7–9, Cl⁻ ≤ 10 ppm; glycol to design (e.g. 25–30%) |
Conductivity / pH meter, refractometer |
|
Flow & ΔP |
Branch flow deviation ≤ ±10%; system ΔP within design range |
Ultrasonic flow meter, ΔP gauge |
|
Temperature & alarms |
Supply temperature ±1 °C; level, leak, ΔP and over-temperature alarms 100% triggered |
Temperature logger, interlock test sheet |
Typical values. Final criteria follow the project design documents and technical agreement.
|
ROBOTIC LASER WELDING |
PRIMARY PIPE PREFABRICATION |
CNC MACHINING OF VALVE BLOCKS |
|
Planning a liquid-cooled data hall? Send us your rack count, heat load per rack, CDU arrangement and machine-room layout. Our engineers will return a sized piping and manifold proposal with a bill of materials. COMPANY ROCKERHILL Global Limited EMAIL Allie.s@rockerhillcn.com |
Hot Tags: liquid cooling piping system, China liquid cooling piping system manufacturers, suppliers, factory











