Coolant Distribution Unit (CDU) Skid

Coolant Distribution Unit (CDU) Skid

A ROCKERHILL coolant distribution unit (CDU) is a factory-built pump and heat-exchanger skid that separates the facility water loop from the clean coolant loop serving liquid-cooled IT racks. It pumps, filters, pressurises and controls the coolant to the cold plates with N+1 redundancy, and reports every value to your BMS or DCIM.
Rating: 4.8
(3 ratings)
Send Inquiry
Description

product-2062-1160

ILLUSTRATIVE RENDER · TYPICAL ROCKERHILL FACILITY CDU SKID, 2 DUTY + 1 STANDBY PUMPS

 

30 kW–5 MW

Typical capacity per unit, from in-rack to facility skid

N+1

Variable-speed pumps with automatic changeover

±0.5 °C

Coolant supply temperature control (typical)

100%

Factory tested: pressure, cleanliness, controls

 

What is a coolant distribution unit?

 

Direct-to-chip liquid cooling needs two water circuits. The facility water system (FWS) carries water from cooling towers, dry coolers or chillers. The technology cooling system (TCS) carries clean, treated coolant through manifolds and cold plates inside the servers. The CDU sits between them. Its plate heat exchanger moves the heat from one loop to the other without mixing them, while its pumps, filters, expansion vessel and controls keep the TCS loop at the right temperature, flow, pressure and cleanliness, around the clock.

 

WHERE THE CDU SITS

LOOP

COOLANT PATH

ROCKERHILL SCOPE

Facility water (FWS)

Cooling tower / dry cooler / chiller → CDU plate heat exchanger

Primary piping (Liquid Cooling Piping System)

CDU

Plate heat exchanger, N+1 pumps, 50 µm filter, expansion and fill, PLC and sensors

This datasheet: CDU skid

Technology cooling (TCS)

CDU → manifolds → UQD couplings → rack cold plates (e.g. 35 °C supply / 45 °C return)

Secondary piping, manifolds, UQDs, coolant (Liquid Cooling Piping System)

 

From one row to the whole data hall

 

TYPE R / W · IN-RACK AND IN-ROW

Rack and row CDUs

A 4U unit inside the rack (30–80 kW) or a cabinet that stands in the row beside the IT racks (150–1,300 kW). Compact, hot-swappable pumps, brazed plate heat exchanger, integrated reservoir and HMI on the door. Ideal for pilot pods, retrofits and colocation suites where capacity grows row by row.

TYPE F · FACILITY SKID

Facility CDU skids

Skid-mounted units of 1.5–5 MW and larger, installed in a plant room or gallery and serving many rows through a TCS header. Gasketed plate heat exchanger, 2+1 or 3+1 pumps, duplex filters and a full PLC panel. One skid replaces many small units and is easier to maintain outside the white space.

WHY ROCKERHILL

Built like a process skid

The CDU is designed and welded by the same team that builds ROCKERHILL process skids: stainless TIG-welded piping, coded welders, documented materials.

One source with the piping

CDU, primary and secondary piping, manifolds, UQD couplings, sensors and coolant come from one supplier and are tested as one system.

Engineered to your duty

Every unit is sized to your heat load, temperatures, coolant and redundancy, then confirmed in a P&ID, GA drawing and control narrative before build.

 

Every function on one tested base frame

 

product-2186-1230

ILLUSTRATIVE RENDER · TYPICAL FACILITY CDU SKID WITH MAIN COMPONENTS NUMBERED

 

NO.

COMPONENT

NO.

COMPONENT

1

Plate heat exchanger, transfers heat from TCS to FWS

6

PLC control panel with touchscreen HMI

2

Circulation pumps, 2 duty + 1 standby, variable speed

7

TCS flow meter for flow and heat-load measurement

3

Duplex filter, 50 µm, change baskets in service

8

Temperature and pressure transmitters

4

Membrane expansion vessel, holds system pressure

9

TCS return connection (supply above, flanged)

5

Make-up tank and automatic fill pump

10

Skid base, lifting lugs, drip tray, leak detection

 

CORE COMPONENTS

 

PUMPS · N+1

Redundant circulation

Each pump has its own variable-speed drive, isolation and check valves. If one fails, the standby starts automatically, and any pump can be replaced while the others run.

PLATE HEAT EXCHANGER

Close approach

AISI 316 plates sized for a 2–5 K approach, so warm-water cooling and free cooling work for more hours of the year.

FILTRATION

Clean coolant

Full-flow duplex filtration protects the fine channels in the cold plates. Filter ΔP is monitored and alarmed.

EXPANSION TANK

Stable pressure

A membrane vessel absorbs thermal expansion, and the make-up tank with fill pump tops up and logs every litre added.

SENSORS

Complete monitoring

Temperature, pressure, flow, level, conductivity, dew point and leak detection, wired and tested in the factory.

PLC + REMOTE

Controls that report

Industrial PLC and HMI with Modbus TCP, BACnet/IP, SNMP and OPC UA to your BMS, DCIM or remote service platform.

 

Pumps and heat exchanger

 

Circulation pumps

PARAMETER

TYPICAL VALUE

Redundancy

N+1 (1+1, 2+1 or 3+1); 2N on request

Pump type

Facility: vertical inline centrifugal. Rack / row: compact EC pumps, hot-swappable

Drive

VFD per pump or EC motor; IE3 / IE4 efficiency class

Changeover

Automatic on fault or low ΔP; scheduled duty rotation

Service

Isolation + check valve per pump; replace one pump while the others run

Shaft seal

Mechanical seal, SiC / SiC, EPDM elastomers (facility pumps)

 

Plate heat exchanger

PARAMETER

TYPICAL VALUE

Type

Facility: gasketed PHE. Rack / row: brazed PHE

Plates

AISI 316 / 316L; brazing material selected for coolant compatibility

Gaskets

EPDM, clip-on (gasketed type)

Approach

2–5 K (TCS supply minus FWS supply) at design point

Arrangement

Single-pass counterflow; plate pack can be extended later (gasketed type)

Frame

Carbon steel, epoxy painted; stainless tie bolts

 

Filtration and pressurisation

 

Filtration

PARAMETER

TYPICAL VALUE

Main filter

Full-flow, 50 µm stainless basket (25 µm option)

Arrangement

Facility: duplex with changeover valves. Rack / row: twin cartridges

Fine filtration

Side-stream 5 µm polishing filter, optional

Monitoring

Differential pressure transmitter with clogging alarm

Commissioning

Flushing connections and temporary strainers supplied

 

Expansion and make-up

PARAMETER

TYPICAL VALUE

Expansion vessel

Membrane type, nitrogen pre-charge, sized for TCS volume

Make-up tank

SS304 with level transmitter and low-level alarm

Fill pump

Automatic pressure make-up; every top-up logged as a leak indicator

Protection

Pressure relief valve, automatic air vents at high points

Options

Vacuum degasser; coolant dosing pot

 

CONSTRUCTION

Wetted materials

SS304 / 316L piping, 316 plates, EPDM / FKM seals. Copper-free TCS loop on request.

Welding

TIG, argon back-purged, by coded welders. Weld records archived by spool.

Base frame

Carbon steel, shot blasted and epoxy painted, with lifting lugs, forklift pockets and drip tray.

Codes

Piping to ASME B31.3, EN 13480 or GB 50235. CE / PED, CRN and UL 508A panels on request.

 

Typical piping and instrumentation diagram

 

product-2600-1640

RH-CDU-PID-01 · TYPICAL FACILITY CDU, ILLUSTRATIVE. PROJECT P&ID ISSUED WITH THE QUOTATION.

 

Control functions

 

01 Supply temperature

The PLC modulates the facility-water control valve (TCV-101) to hold the TCS supply set point, typically within ±0.5 °C.

 

02 Flow or ΔP

Pump speed holds a constant differential pressure at the manifolds or a fixed flow, so racks get the same flow as load changes.

 

simulator

Room dew point is measured. The supply set point is kept above it, so no condensation forms on pipes or cold plates.

 

04  N+1 management

Automatic pump changeover, duty rotation and redundant supply temperature sensors keep the loop running through single failures.

 

05 Group control

Several CDUs on a common header share load, run lead / lag and back each other up.

 

06 Safe states

On loss of communication the CDU holds its last set point. On a leak alarm it can isolate the affected section if configured.

 

Sensors fitted as standard

 

The CDU uses the same sensor family as the ROCKERHILL liquid cooling piping system, including dry ceramic capacitive pressure transmitters with 316L wetted diaphragms. All points are wired to the PLC, configured and alarm-tested at the factory.

 

MEASUREMENT

TYPICAL POINTS

USED FOR

Temperature (PT1000, class A)

TCS supply (redundant) and return; FWS supply and return

Supply temperature control, heat load calculation

Pressure

TCS supply and return, pump suction and discharge, FWS, expansion vessel

ΔP control, low-pressure and overpressure alarms

Differential pressure

Across main filter

Clogging alarm, filter service planning

Flow

TCS loop (electromagnetic or ultrasonic); FWS optional

Flow control, live kW, low-flow alarm

Level

Make-up tank

Low-level alarm, top-up logging

Coolant quality

Conductivity (pH and turbidity optional)

Coolant condition trend, service alerts

Dew point

Room temperature and humidity

Condensation protection

Leak detection

Drip tray sensor; rope sensor to racks optional

Leak alarm, optional automatic isolation

 

Connected to your BMS and DCIM

 

Open protocols

Modbus TCP / RTU, BACnet/IP, SNMP v2c / v3, OPC UA

Web HMI

Live values, trends, alarms and event log from any browser on the network

Remote service

Optional secure VPN / 4G gateway for ROCKERHILL support, enabled by the owner

 

PLC AND HMI

TYPICAL VALUE

Controller

Industrial PLC, brand per project or site standard

HMI

7" (rack / row) or 10" (facility) colour touchscreen

Data logging

Trends and events stored on board, CSV export

Power supply

Dual feed A / B with automatic transfer; UPS for controls

Points list

Agreed with the customer and tested at FAT

 

Alarms reported

■ High / low supply temperature, dew-point margin

■ Low flow, low / high pressure, filter ΔP

■ Low tank level, excessive top-up, high conductivity

■ Leak detected

■ Pump, drive or sensor fault, loss of power feed A or B

 

Rack, row and facility CDUs

 

product-1670-1253

ILLUSTRATIVE RENDER · IN-ROW CDU, SIDE PANEL REMOVED

The in-row CDU stands in the rack row and connects to overhead or underfloor secondary piping. Pumps, brazed heat exchanger, twin filters, reservoir and electrics are reached from the front and side, and the HMI sits on the door.

 

The facility skid serves whole halls from a plant room. Both types use the same control software, sensors and protocols, so a site can mix them and see every unit on one screen.

MODEL

TYPE

CAPACITY*

TCS FLOW*

PUMPS

APPROACH*

W × D × H (MM)*

TCS CONN.

RH-CDU-R80

In-rack, 4U

30–80 kW

≤ 120 L/min

1+1

≤ 5 K

19" × 1,000 × 177

DN32

RH-CDU-W350

In-row cabinet

150–350 kW

≤ 530 L/min

1+1

≤ 4 K

600 × 1,200 × 2,000

DN65

RH-CDU-W800

In-row cabinet

400–800 kW

≤ 1,200 L/min

1+1

≤ 4 K

800 × 1,200 × 2,000

DN100

RH-CDU-W1300

In-row cabinet

800–1,300 kW

≤ 2,000 L/min

2+1

≤ 4 K

1,200 × 1,200 × 2,000

DN125

RH-CDU-F2500

Facility skid

1.5–2.5 MW

≤ 225 m³/h

2+1

≤ 3 K

4,200 × 2,000 × 2,300

DN200

RH-CDU-F5000

Facility skid

3–5 MW

≤ 450 m³/h

3+1

≤ 3 K

6,000 × 2,400 × 2,500

DN300

RH-CDU-FX

Custom skid

> 5 MW

By design

N+1 / 2N

By design

Modular

By design

* Typical values, to be confirmed. Based on PG25 coolant, TCS ΔT 10 K and the approach shown. Actual capacity, flow and size depend on the duty point, coolant, redundancy and options, and are confirmed in the ROCKERHILL proposal for each project.

 

DESIGN DATA

PARAMETER

TYPICAL RANGE (TO CONFIRM PER PROJECT)

TCS supply temperature

20–45 °C adjustable; control stability ±0.5 °C at steady load

FWS supply temperature

15–40 °C, suits warm-water and free-cooling designs (ASHRAE W17–W40 classes)

TCS ΔT / approach

5–15 K (10 K typical) / 2–5 K

Design pressure / test

TCS 1.0 MPa, FWS 1.0 or 1.6 MPa / hydrostatic test 1.5 × design pressure

Coolant

PG25 or EG25 inhibited glycol, or treated deionised water

Power supply

380–415 V / 3 ph / 50 Hz or 460–480 V / 3 ph / 60 Hz, dual feed

Ambient

5–40 °C, ≤ 85 % RH non-condensing; noise ≤ 75 dB(A) at 1 m

 

General arrangement, facility skid

 

product-2600-1640

RH-CDU-GA-01 · TYPICAL FACILITY CDU SKID, ILLUSTRATIVE. L, W AND H PER MODEL TABLE.

Skid connections

NOZZLE

SERVICE

N1 / N2

FWS supply / return, flanged (EN 1092-1 or ASME B16.5)

N3 / N4

TCS supply / return to rack manifolds, flanged

Drain / vent

Ball valves at low points, automatic air vents at high points

Fill

Make-up tank fill connection with hose coupling

Electrical

Power feeds A / B and data cables enter from top or bottom

Options

■ 2N pumps, dual heat exchangers or dual filters for higher availability

■ Copper-free TCS loop, 316L throughout, electropolished piping

■ Side-stream fine filtration, vacuum degasser, coolant dosing

■ Rope leak detection to racks with automatic isolation valves

■ Containerised or enclosed skid for outdoor or modular sites

■ CE / PED, CRN or UL 508A panel certification

 

Where ROCKERHILL CDUs are used

 

FACILITY

TYPICAL CDU ARRANGEMENT

AI and HPC data halls

Facility skids on a TCS header serving GPU racks on cold plates, N+1 at unit level and across units

Colocation and cloud

In-row CDUs added suite by suite as tenants move to liquid cooling, beside existing air-cooled space

Retrofit of air-cooled rooms

In-row or in-rack CDUs connected to existing chilled water, with no new heat rejection plant at first

Edge and modular data centers

Compact CDUs built into containers and prefabricated modules, shipped tested

Heat reuse

High return temperatures (45 °C and above) passed to district heating or process heat users

 

What we test before it ships

 

TEST

TYPICAL ACCEPTANCE VALUE

Hydrostatic & tightness

1.5 × design pressure for 30 min, no leak; 24 h pressure hold at working pressure

Cleanliness

Flushed to ISO 4406 18/16/13 (NAS class 7) or project requirement

Pumps and controls

Pump changeover under flow, VFD response, interlocks; 100% of alarms triggered

Electrical

Insulation test, I/O check, dual-feed transfer, communication test with customer points list

Performance (option)

Flow–head check on the test loop; heat-load test where capacity allows

Documents

FAT report, P&ID, GA, wiring diagrams, IOM manual, material certificates, spare parts list

Typical values. Final criteria follow the project specification and technical agreement.

 

product-1536-1024

ROBOTIC WELDING OF STAINLESS SPOOLS

product-1024-682

SKID PIPING PREFABRICATION

product-423-282

IN-HOUSE CNC MACHINING

 

RELATED PRODUCT

ROCKERHILL · DATA CENTER COOLING

Liquid Cooling Piping System

The CDU moves the heat; the piping system delivers the coolant. ROCKERHILL supplies primary carbon and stainless mains, secondary prefabricated piping, manifolds, UQD dry quick couplings, sensors and coolant, prefabricated and 100% tested. Order both for one point of responsibility from the cooling plant to the cold plate.

See the Liquid Cooling Piping System datasheet →

 

From duty point to running CDU in four steps

 

SIZE

Duty and redundancy

Heat load, temperatures, coolant and N+1 or 2N agreed with your designer.

01

ENGINEER

P&ID, GA, controls

Drawings, control narrative and BMS points list approved before build.

02

BUILD

Fabrication and FAT

Welded, wired, flushed and tested in the factory, witnessed if required.

03

COMMISSION

Site start-up

Connection to the piping system, filling, venting, tuning and handover.

04 

Common questions

 

Q: In-row or facility CDU?

A: In-row and in-rack CDUs suit pilots, retrofits and growth row by row. Facility skids suit large halls and keep pumps and filters out of the white space. Many sites use both.

Q: How is the CDU sized?

A: On IT heat load in kW, TCS supply and return temperatures, facility water temperature, coolant type and the redundancy required. Send these and we select the model.

Q: How does N+1 work?

A: One more pump than the load needs is installed and kept ready. On a fault the standby starts automatically, and duty rotates so wear is even.

Q: Which coolant can be used?

A: PG25 or EG25 inhibited glycol, or treated deionised water, chosen to match the cold plates. ROCKERHILL can supply the coolant and fill the system.

Q: Will it connect to our BMS?

A: Yes. Modbus, BACnet, SNMP and OPC UA are standard, and the points list is tested at FAT.

Q: Can you supply the piping too?

A: Yes. The ROCKERHILL Liquid Cooling Piping System covers mains, manifolds, UQD couplings and sensors, tested with the CDU.

 

REQUEST A QUOTATION

 

INFORMATION WE NEED

DETAIL

Heat load

kW per CDU and total, number and density of racks

Temperatures

TCS supply / return, facility water source and temperature

Coolant and redundancy

Glycol or DI water; N+1, 2N, number of units

Type and space

In-rack, in-row or facility skid; room layout and access

Power, controls, codes

Voltage / Hz, BMS protocol, CE / UL / CRN requirements

 

modular-1

Planning liquid cooling?

Our engineers will return a sized CDU proposal with P&ID, GA drawing and, if needed, the matching piping system. COMPANY ROCKERHILL Global Limited  EMAIL Allie.s@rockerhillcn.com WEB www.rockerhillcn.com

Hot Tags: coolant distribution unit (cdu) skid, China coolant distribution unit (cdu) skid manufacturers, suppliers, factory

Send Inquiry