
ILLUSTRATIVE RENDER · TYPICAL ROCKERHILL FACILITY CDU SKID, 2 DUTY + 1 STANDBY PUMPS
|
30 kW–5 MW Typical capacity per unit, from in-rack to facility skid |
N+1 Variable-speed pumps with automatic changeover |
±0.5 °C Coolant supply temperature control (typical) |
100% Factory tested: pressure, cleanliness, controls |
What is a coolant distribution unit?
Direct-to-chip liquid cooling needs two water circuits. The facility water system (FWS) carries water from cooling towers, dry coolers or chillers. The technology cooling system (TCS) carries clean, treated coolant through manifolds and cold plates inside the servers. The CDU sits between them. Its plate heat exchanger moves the heat from one loop to the other without mixing them, while its pumps, filters, expansion vessel and controls keep the TCS loop at the right temperature, flow, pressure and cleanliness, around the clock.
WHERE THE CDU SITS
|
LOOP |
COOLANT PATH |
ROCKERHILL SCOPE |
|
Facility water (FWS) |
Cooling tower / dry cooler / chiller → CDU plate heat exchanger |
Primary piping (Liquid Cooling Piping System) |
|
CDU |
Plate heat exchanger, N+1 pumps, 50 µm filter, expansion and fill, PLC and sensors |
This datasheet: CDU skid |
|
Technology cooling (TCS) |
CDU → manifolds → UQD couplings → rack cold plates (e.g. 35 °C supply / 45 °C return) |
Secondary piping, manifolds, UQDs, coolant (Liquid Cooling Piping System) |
From one row to the whole data hall
|
TYPE R / W · IN-RACK AND IN-ROW Rack and row CDUs A 4U unit inside the rack (30–80 kW) or a cabinet that stands in the row beside the IT racks (150–1,300 kW). Compact, hot-swappable pumps, brazed plate heat exchanger, integrated reservoir and HMI on the door. Ideal for pilot pods, retrofits and colocation suites where capacity grows row by row. |
TYPE F · FACILITY SKID Facility CDU skids Skid-mounted units of 1.5–5 MW and larger, installed in a plant room or gallery and serving many rows through a TCS header. Gasketed plate heat exchanger, 2+1 or 3+1 pumps, duplex filters and a full PLC panel. One skid replaces many small units and is easier to maintain outside the white space. |
WHY ROCKERHILL
|
Built like a process skid The CDU is designed and welded by the same team that builds ROCKERHILL process skids: stainless TIG-welded piping, coded welders, documented materials. |
One source with the piping CDU, primary and secondary piping, manifolds, UQD couplings, sensors and coolant come from one supplier and are tested as one system. |
Engineered to your duty Every unit is sized to your heat load, temperatures, coolant and redundancy, then confirmed in a P&ID, GA drawing and control narrative before build. |
Every function on one tested base frame

ILLUSTRATIVE RENDER · TYPICAL FACILITY CDU SKID WITH MAIN COMPONENTS NUMBERED
|
NO. |
COMPONENT |
NO. |
COMPONENT |
|
1 |
Plate heat exchanger, transfers heat from TCS to FWS |
6 |
PLC control panel with touchscreen HMI |
|
2 |
Circulation pumps, 2 duty + 1 standby, variable speed |
7 |
TCS flow meter for flow and heat-load measurement |
|
3 |
Duplex filter, 50 µm, change baskets in service |
8 |
Temperature and pressure transmitters |
|
4 |
Membrane expansion vessel, holds system pressure |
9 |
TCS return connection (supply above, flanged) |
|
5 |
Make-up tank and automatic fill pump |
10 |
Skid base, lifting lugs, drip tray, leak detection |
CORE COMPONENTS
|
PUMPS · N+1 Redundant circulation Each pump has its own variable-speed drive, isolation and check valves. If one fails, the standby starts automatically, and any pump can be replaced while the others run. |
PLATE HEAT EXCHANGER Close approach AISI 316 plates sized for a 2–5 K approach, so warm-water cooling and free cooling work for more hours of the year. |
FILTRATION Clean coolant Full-flow duplex filtration protects the fine channels in the cold plates. Filter ΔP is monitored and alarmed. |
|
EXPANSION TANK Stable pressure A membrane vessel absorbs thermal expansion, and the make-up tank with fill pump tops up and logs every litre added. |
SENSORS Complete monitoring Temperature, pressure, flow, level, conductivity, dew point and leak detection, wired and tested in the factory. |
PLC + REMOTE Controls that report Industrial PLC and HMI with Modbus TCP, BACnet/IP, SNMP and OPC UA to your BMS, DCIM or remote service platform. |
Pumps and heat exchanger
Circulation pumps
|
PARAMETER |
TYPICAL VALUE |
|
Redundancy |
N+1 (1+1, 2+1 or 3+1); 2N on request |
|
Pump type |
Facility: vertical inline centrifugal. Rack / row: compact EC pumps, hot-swappable |
|
Drive |
VFD per pump or EC motor; IE3 / IE4 efficiency class |
|
Changeover |
Automatic on fault or low ΔP; scheduled duty rotation |
|
Service |
Isolation + check valve per pump; replace one pump while the others run |
|
Shaft seal |
Mechanical seal, SiC / SiC, EPDM elastomers (facility pumps) |
Plate heat exchanger
|
PARAMETER |
TYPICAL VALUE |
|
Type |
Facility: gasketed PHE. Rack / row: brazed PHE |
|
Plates |
AISI 316 / 316L; brazing material selected for coolant compatibility |
|
Gaskets |
EPDM, clip-on (gasketed type) |
|
Approach |
2–5 K (TCS supply minus FWS supply) at design point |
|
Arrangement |
Single-pass counterflow; plate pack can be extended later (gasketed type) |
|
Frame |
Carbon steel, epoxy painted; stainless tie bolts |
Filtration and pressurisation
Filtration
|
PARAMETER |
TYPICAL VALUE |
|
Main filter |
Full-flow, 50 µm stainless basket (25 µm option) |
|
Arrangement |
Facility: duplex with changeover valves. Rack / row: twin cartridges |
|
Fine filtration |
Side-stream 5 µm polishing filter, optional |
|
Monitoring |
Differential pressure transmitter with clogging alarm |
|
Commissioning |
Flushing connections and temporary strainers supplied |
Expansion and make-up
|
PARAMETER |
TYPICAL VALUE |
|
Expansion vessel |
Membrane type, nitrogen pre-charge, sized for TCS volume |
|
Make-up tank |
SS304 with level transmitter and low-level alarm |
|
Fill pump |
Automatic pressure make-up; every top-up logged as a leak indicator |
|
Protection |
Pressure relief valve, automatic air vents at high points |
|
Options |
Vacuum degasser; coolant dosing pot |
CONSTRUCTION
|
Wetted materials SS304 / 316L piping, 316 plates, EPDM / FKM seals. Copper-free TCS loop on request. |
Welding TIG, argon back-purged, by coded welders. Weld records archived by spool. |
Base frame Carbon steel, shot blasted and epoxy painted, with lifting lugs, forklift pockets and drip tray. |
Codes Piping to ASME B31.3, EN 13480 or GB 50235. CE / PED, CRN and UL 508A panels on request. |
Typical piping and instrumentation diagram

RH-CDU-PID-01 · TYPICAL FACILITY CDU, ILLUSTRATIVE. PROJECT P&ID ISSUED WITH THE QUOTATION.
Control functions
01 Supply temperature
The PLC modulates the facility-water control valve (TCV-101) to hold the TCS supply set point, typically within ±0.5 °C.
02 Flow or ΔP
Pump speed holds a constant differential pressure at the manifolds or a fixed flow, so racks get the same flow as load changes.
simulator
Room dew point is measured. The supply set point is kept above it, so no condensation forms on pipes or cold plates.
04 N+1 management
Automatic pump changeover, duty rotation and redundant supply temperature sensors keep the loop running through single failures.
05 Group control
Several CDUs on a common header share load, run lead / lag and back each other up.
06 Safe states
On loss of communication the CDU holds its last set point. On a leak alarm it can isolate the affected section if configured.
Sensors fitted as standard
The CDU uses the same sensor family as the ROCKERHILL liquid cooling piping system, including dry ceramic capacitive pressure transmitters with 316L wetted diaphragms. All points are wired to the PLC, configured and alarm-tested at the factory.
|
MEASUREMENT |
TYPICAL POINTS |
USED FOR |
|
Temperature (PT1000, class A) |
TCS supply (redundant) and return; FWS supply and return |
Supply temperature control, heat load calculation |
|
Pressure |
TCS supply and return, pump suction and discharge, FWS, expansion vessel |
ΔP control, low-pressure and overpressure alarms |
|
Differential pressure |
Across main filter |
Clogging alarm, filter service planning |
|
Flow |
TCS loop (electromagnetic or ultrasonic); FWS optional |
Flow control, live kW, low-flow alarm |
|
Level |
Make-up tank |
Low-level alarm, top-up logging |
|
Coolant quality |
Conductivity (pH and turbidity optional) |
Coolant condition trend, service alerts |
|
Dew point |
Room temperature and humidity |
Condensation protection |
|
Leak detection |
Drip tray sensor; rope sensor to racks optional |
Leak alarm, optional automatic isolation |
Connected to your BMS and DCIM
|
Open protocols Modbus TCP / RTU, BACnet/IP, SNMP v2c / v3, OPC UA |
Web HMI Live values, trends, alarms and event log from any browser on the network |
Remote service Optional secure VPN / 4G gateway for ROCKERHILL support, enabled by the owner |
|
PLC AND HMI |
TYPICAL VALUE |
|
Controller |
Industrial PLC, brand per project or site standard |
|
HMI |
7" (rack / row) or 10" (facility) colour touchscreen |
|
Data logging |
Trends and events stored on board, CSV export |
|
Power supply |
Dual feed A / B with automatic transfer; UPS for controls |
|
Points list |
Agreed with the customer and tested at FAT |
Alarms reported
■ High / low supply temperature, dew-point margin
■ Low flow, low / high pressure, filter ΔP
■ Low tank level, excessive top-up, high conductivity
■ Leak detected
■ Pump, drive or sensor fault, loss of power feed A or B
Rack, row and facility CDUs
|
ILLUSTRATIVE RENDER · IN-ROW CDU, SIDE PANEL REMOVED |
The in-row CDU stands in the rack row and connects to overhead or underfloor secondary piping. Pumps, brazed heat exchanger, twin filters, reservoir and electrics are reached from the front and side, and the HMI sits on the door.
The facility skid serves whole halls from a plant room. Both types use the same control software, sensors and protocols, so a site can mix them and see every unit on one screen. |
||||||||
|
MODEL |
TYPE |
CAPACITY* |
TCS FLOW* |
PUMPS |
APPROACH* |
W × D × H (MM)* |
TCS CONN. |
||
|
RH-CDU-R80 |
In-rack, 4U |
30–80 kW |
≤ 120 L/min |
1+1 |
≤ 5 K |
19" × 1,000 × 177 |
DN32 |
||
|
RH-CDU-W350 |
In-row cabinet |
150–350 kW |
≤ 530 L/min |
1+1 |
≤ 4 K |
600 × 1,200 × 2,000 |
DN65 |
||
|
RH-CDU-W800 |
In-row cabinet |
400–800 kW |
≤ 1,200 L/min |
1+1 |
≤ 4 K |
800 × 1,200 × 2,000 |
DN100 |
||
|
RH-CDU-W1300 |
In-row cabinet |
800–1,300 kW |
≤ 2,000 L/min |
2+1 |
≤ 4 K |
1,200 × 1,200 × 2,000 |
DN125 |
||
|
RH-CDU-F2500 |
Facility skid |
1.5–2.5 MW |
≤ 225 m³/h |
2+1 |
≤ 3 K |
4,200 × 2,000 × 2,300 |
DN200 |
||
|
RH-CDU-F5000 |
Facility skid |
3–5 MW |
≤ 450 m³/h |
3+1 |
≤ 3 K |
6,000 × 2,400 × 2,500 |
DN300 |
||
|
RH-CDU-FX |
Custom skid |
> 5 MW |
By design |
N+1 / 2N |
By design |
Modular |
By design |
||
|
* Typical values, to be confirmed. Based on PG25 coolant, TCS ΔT 10 K and the approach shown. Actual capacity, flow and size depend on the duty point, coolant, redundancy and options, and are confirmed in the ROCKERHILL proposal for each project. |
|||||||||
DESIGN DATA
|
PARAMETER |
TYPICAL RANGE (TO CONFIRM PER PROJECT) |
|
TCS supply temperature |
20–45 °C adjustable; control stability ±0.5 °C at steady load |
|
FWS supply temperature |
15–40 °C, suits warm-water and free-cooling designs (ASHRAE W17–W40 classes) |
|
TCS ΔT / approach |
5–15 K (10 K typical) / 2–5 K |
|
Design pressure / test |
TCS 1.0 MPa, FWS 1.0 or 1.6 MPa / hydrostatic test 1.5 × design pressure |
|
Coolant |
PG25 or EG25 inhibited glycol, or treated deionised water |
|
Power supply |
380–415 V / 3 ph / 50 Hz or 460–480 V / 3 ph / 60 Hz, dual feed |
|
Ambient |
5–40 °C, ≤ 85 % RH non-condensing; noise ≤ 75 dB(A) at 1 m |
General arrangement, facility skid

RH-CDU-GA-01 · TYPICAL FACILITY CDU SKID, ILLUSTRATIVE. L, W AND H PER MODEL TABLE.
Skid connections
|
NOZZLE |
SERVICE |
|
N1 / N2 |
FWS supply / return, flanged (EN 1092-1 or ASME B16.5) |
|
N3 / N4 |
TCS supply / return to rack manifolds, flanged |
|
Drain / vent |
Ball valves at low points, automatic air vents at high points |
|
Fill |
Make-up tank fill connection with hose coupling |
|
Electrical |
Power feeds A / B and data cables enter from top or bottom |
Options
■ 2N pumps, dual heat exchangers or dual filters for higher availability
■ Copper-free TCS loop, 316L throughout, electropolished piping
■ Side-stream fine filtration, vacuum degasser, coolant dosing
■ Rope leak detection to racks with automatic isolation valves
■ Containerised or enclosed skid for outdoor or modular sites
■ CE / PED, CRN or UL 508A panel certification
Where ROCKERHILL CDUs are used
|
FACILITY |
TYPICAL CDU ARRANGEMENT |
|
AI and HPC data halls |
Facility skids on a TCS header serving GPU racks on cold plates, N+1 at unit level and across units |
|
Colocation and cloud |
In-row CDUs added suite by suite as tenants move to liquid cooling, beside existing air-cooled space |
|
Retrofit of air-cooled rooms |
In-row or in-rack CDUs connected to existing chilled water, with no new heat rejection plant at first |
|
Edge and modular data centers |
Compact CDUs built into containers and prefabricated modules, shipped tested |
|
Heat reuse |
High return temperatures (45 °C and above) passed to district heating or process heat users |
What we test before it ships
|
TEST |
TYPICAL ACCEPTANCE VALUE |
|
Hydrostatic & tightness |
1.5 × design pressure for 30 min, no leak; 24 h pressure hold at working pressure |
|
Cleanliness |
Flushed to ISO 4406 18/16/13 (NAS class 7) or project requirement |
|
Pumps and controls |
Pump changeover under flow, VFD response, interlocks; 100% of alarms triggered |
|
Electrical |
Insulation test, I/O check, dual-feed transfer, communication test with customer points list |
|
Performance (option) |
Flow–head check on the test loop; heat-load test where capacity allows |
|
Documents |
FAT report, P&ID, GA, wiring diagrams, IOM manual, material certificates, spare parts list |
Typical values. Final criteria follow the project specification and technical agreement.
|
ROBOTIC WELDING OF STAINLESS SPOOLS |
SKID PIPING PREFABRICATION |
IN-HOUSE CNC MACHINING |
RELATED PRODUCT
|
ROCKERHILL · DATA CENTER COOLING Liquid Cooling Piping System The CDU moves the heat; the piping system delivers the coolant. ROCKERHILL supplies primary carbon and stainless mains, secondary prefabricated piping, manifolds, UQD dry quick couplings, sensors and coolant, prefabricated and 100% tested. Order both for one point of responsibility from the cooling plant to the cold plate. See the Liquid Cooling Piping System datasheet → |
From duty point to running CDU in four steps
SIZE
Duty and redundancy
Heat load, temperatures, coolant and N+1 or 2N agreed with your designer.
01
ENGINEER
P&ID, GA, controls
Drawings, control narrative and BMS points list approved before build.
02
BUILD
Fabrication and FAT
Welded, wired, flushed and tested in the factory, witnessed if required.
03
COMMISSION
Site start-up
Connection to the piping system, filling, venting, tuning and handover.
04
Common questions
Q: In-row or facility CDU?
A: In-row and in-rack CDUs suit pilots, retrofits and growth row by row. Facility skids suit large halls and keep pumps and filters out of the white space. Many sites use both.
Q: How is the CDU sized?
A: On IT heat load in kW, TCS supply and return temperatures, facility water temperature, coolant type and the redundancy required. Send these and we select the model.
Q: How does N+1 work?
A: One more pump than the load needs is installed and kept ready. On a fault the standby starts automatically, and duty rotates so wear is even.
Q: Which coolant can be used?
A: PG25 or EG25 inhibited glycol, or treated deionised water, chosen to match the cold plates. ROCKERHILL can supply the coolant and fill the system.
Q: Will it connect to our BMS?
A: Yes. Modbus, BACnet, SNMP and OPC UA are standard, and the points list is tested at FAT.
Q: Can you supply the piping too?
A: Yes. The ROCKERHILL Liquid Cooling Piping System covers mains, manifolds, UQD couplings and sensors, tested with the CDU.
REQUEST A QUOTATION
|
INFORMATION WE NEED |
DETAIL |
|
Heat load |
kW per CDU and total, number and density of racks |
|
Temperatures |
TCS supply / return, facility water source and temperature |
|
Coolant and redundancy |
Glycol or DI water; N+1, 2N, number of units |
|
Type and space |
In-rack, in-row or facility skid; room layout and access |
|
Power, controls, codes |
Voltage / Hz, BMS protocol, CE / UL / CRN requirements |

Planning liquid cooling?
Our engineers will return a sized CDU proposal with P&ID, GA drawing and, if needed, the matching piping system. COMPANY ROCKERHILL Global Limited EMAIL Allie.s@rockerhillcn.com WEB www.rockerhillcn.com
Hot Tags: coolant distribution unit (cdu) skid, China coolant distribution unit (cdu) skid manufacturers, suppliers, factory







